Veratex Revolution

Loading Veratex Revolution...

Nullam dignissim, ante scelerisque the is euismod fermentum odio sem semper the is erat, a feugiat leo urna eget eros. Duis Aenean a imperdiet risus.

BTS Manual

Technical Specifications
  •         The overhead rails supplied to the ring frame for the transportation of roving bobbins is extended by 3 meters.
  •         The doffed full bobbins are loaded in a trolley and brought to alley.
  •         The empty bobbin rail from the ring frame is moved manually to this alley where the empty roving bobbins are replaced with fully roving bobbins.
  •         Again the train with full bobbins is moved manually to the ring frame. This is a very simple and limited purpose option.